Heat has significantly impacted the readiness of our solid waste and yard waste trucks. As a result, we haven’t had enough available trucks to maintain solid waste and yard waste pickup schedules. Equipment issues with these trucks in such hot and humid conditions as we’ve experienced over the last few weeks are not uncommon. We apologize to residents for the inconvenience. Our first priority is to pick up solid waste (green carts). Our staff is currently working on its off days of Wednesdays and Saturdays to catch up on missed routes. Our second priority is yard waste (brown carts) and it may not be collected this week. At this time, it is recommended to leave solid waste out for pickup and it will be collected as soon as possible. We hope to be back on schedule next week and will keep residents informed on our progress. 

Performance Security

Performance Security

Stormwater: All Stormwater Control Measures requires a performance security to be provided to the City. A construction cost estimate of the SCM must be provided with the initial submittal for review. Once the estimate is approved, a bond may be obtained.

  • Commercial – 75% of the estimated cost of SCM construction PRIOR to Infrastructure Permit Approval
  • Residential – 100% of the estimated conversion cost from erosion control measure to SCM PRIOR to Final Plat Approval

Sidewalk: A sidewalk bond is required if a required if a sidewalk bond has not yet been completed.

  • Commercial – The sidewalk must be installed on a commercial site prior to CO. In some extenuating circumstances (i.e. planned road construction) bonding the sidewalk may be allowed.
  • Residential – A sidewalk bond 75% of the estimated sidewalk cost must be provided prior to Final Plat.

Truck Route: A truck route bond may be required if a City Street is to be used for construction traffic. A bond amount will be assessed based off of the Truck Route Application submitted with the initial plan submittal.

  • Commercial & Residential – 100% of the estimated truck route bond cost calculated from the application received.

The City accepts the following types of Bonds:

  1. Cash Bond
  2. Surety Bond
  3. Letter of Credit

Please provide the appropriate bond form for the bond purpose and type:

Stormwater

Sidewalk/Other Improvements

Truck Route

Cash Bond

Cash Bond

Cash Bond

Surety Bond

Surety Bond

Surety Bond

Letter of Credit

Letter of Credit