Heat has significantly impacted the readiness of our solid waste and yard waste trucks. As a result, we haven’t had enough available trucks to maintain solid waste and yard waste pickup schedules. Equipment issues with these trucks in such hot and humid conditions as we’ve experienced over the last few weeks are not uncommon. We apologize to residents for the inconvenience. Our first priority is to pick up solid waste (green carts). Our staff is currently working on its off days of Wednesdays and Saturdays to catch up on missed routes. Our second priority is yard waste (brown carts) and it may not be collected this week. At this time, it is recommended to leave solid waste out for pickup and it will be collected as soon as possible. We hope to be back on schedule next week and will keep residents informed on our progress. 

Sykes Pond Road

Project Overview:

The City will construct a bridge along Sykes Pond Road to re-open the road. A section of Sykes Pond Road, including a culvert, was washed away during a severe storm event on September 29, 2016. The City has hired a consulting engineering firm to develop a design to repair the road and replace the culvert. The new design will include a new bridge to replace the previous culvert.  

Project Details: 

  • Status: Design
  • Next Step: Advertise and Award Contract
  • Contract / Contractor:
    • Design: Moffat & Nichol
    • Construction: TBD
  • Estimated Completion Date: Late Summer 2019

Affected Neighborhoods:

  • Lake William
  • Estates at Sykes Pond

Contributing Departments:

  • Public Services Department

Contacts:

  • City of Fayetteville Contact: Chris Haddock 910-433-1656

Project Update:

Update 7/10/2019