In order to receive a Commercial CO, please see the below requirements.

Two (2) copies of plans must be signed and sealed by a North Carolina licensed professional as outlined in Section 23-35 of the Ordinance and certified by the designer that the completed project and record drawing plans are in compliance with approved stormwater management plans and designs and the requirements of the Stormwater Control Ordinance. Mylars are not required but the submitted plans must be clearly identified as “Record Drawings”.

Storm Drainage Record Drawing Requirements

Performance Guarantee Checklist

NOPC Inspection of Commercial Sites

NOPC of Certificate of Occupancy