Residential Final Plat Requirements
Residential Final Plat checklist and information can be found here. For questions regarding the information found on this page, please contact the Engineering Division of Public Services at 910-433-1656.
Please note that in single-family residential subdivisions where the stormwater management facility initially functions as an erosion control measure, it will be necessary to provide a record drawing survey and certification letter at the completion of the drainage system minus the BMP. After the erosion control measure is converted to a stormwater management facility, it will be necessary to provide a record drawing survey and certification letter for the BMP only.
Storm Drainage Record Drawing Requirements
Residential Final Plat Check List