Sessoms Street Drainage Improvements

  

Sessoms MapProject Overview: 

The Sessoms Street Drainage Improvements Project was identified through the Cape Fear 2 watershed study. The project is located along Buxton Boulevard, Sessoms Street, and Montgomery Street to the west of S Eastern Boulevard adjacent to Walker Elementary. The existing drainage system backs up water into the neighborhood due to a high tailwater condition and a shallow drainage system causing flooding in the neighborhood. The Sessoms Street improvements will create more pipe capacity by increasing the size of the current storm system and creating a new culvert outfall across Buxton Boulevard while rerouting the existing path of the storm system.

Project Funding:

  • Stormwater Enterprise Fund

Project Details:

· Status: 95% Design

· Contract / Contractor: TBD

· Design: WSP USA Environmental & Infrastructure, Inc

· Construction: Est. July 2024-December 2025

· Construction Cost: Est. $4.1M

Affected Neighborhoods:

Habitat Village

Old Wilmington Road Area

S Eastern Boulevard Area

Contacts: 

Ethan Riddle

EthanRiddle@FayettevilleNC.gov

(910) 433 - 1271

For More Information