Sessoms Street Drainage Improvements
Project Overview:
The Sessoms Street Drainage Improvements Project was identified through the Cape Fear 2 watershed study. The project is located along Buxton Boulevard, Sessoms Street, and Montgomery Street to the west of S Eastern Boulevard adjacent to Walker Elementary. The existing drainage system backs up water into the neighborhood due to a high tailwater condition and a shallow drainage system causing flooding in the neighborhood. The Sessoms Street improvements will create more pipe capacity by increasing the size of the current storm system and creating a new culvert outfall across Buxton Boulevard while rerouting the existing path of the storm system.
Project Funding:
- Stormwater Enterprise Fund
Project Details:
· Status: 95% Design
· Contract / Contractor: TBD
· Design: WSP USA Environmental & Infrastructure, Inc
· Construction: Est. July 2024-December 2025
· Construction Cost: Est. $4.1M
Affected Neighborhoods:
Habitat Village
Old Wilmington Road Area
S Eastern Boulevard Area
Contacts:
Ethan Riddle
EthanRiddle@FayettevilleNC.gov
(910) 433 - 1271
For More Information
- Follow us on Twitter and get notified on our latest updates! twitter.com/FayNC_PubServ