Neville Street

  

Project Overview:

The Neville Street area is located in the northern part of the City and has experienced localized yard, street and structure flooding during major storm events. An initial site investigation confirmed that there was insufficient capacity in the local storm sewers to meet the City’s current level of service requirements and that the existing infrastructure was in poor condition and failing in some locations. The City will install approximately 1,300 linear feet of new storm sewers on Neville Street to reduce the frequency, severity and duration of localized flooding. 

Project Funding:

  • FEMA (75%) and City Stormwater Utility Fee (25%)

FEMA FINAL PUBLIC NOTICE

Project Details: 

  • Status: Awaiting final Permits
  • Contract / Contractor:
    • Design: WK Dickson
    • Construction: TBD
  • Estimated Construction Cost: $1.8 M.

Affected Neighborhoods: 

  • Fairview

Contributing Departments: 

  • Public Services Department

Contacts: 

  • City of Fayetteville Contact: Engineering Department 910-433-1656